Andion CH4 Renewables lands $27.85M for Italian biomethane plant

March 5, 2026 |

In Italy, Andion CH4 Renewables successfully closed a €24 million project financing to fund the construction of its fully permitted biomethane production plant in Mirandola (Modena), Emilia-Romagna.

The project represents a further milestone in Andion’s integrated platform strategy focused on the development, construction and long-term operation of low-carbon anaerobic digestion infrastructure across Europe.

The Mirandola plant, which is under construction, is being developed under Italy’s DM 2022 biomethane incentive scheme and will produce liquefied biomethane (LBG) from agricultural waste using anaerobic digestion technology. The facility will have a maximum annual production capacity of approximately 44 GWh (c. 3,000 tons of LBG) and will process more than 70,000 tons of manure-based feedstock per year under long-term supply agreements with local farmers. The project benefits from a long-term LBG offtake agreement with SOL Group, which also holds a 20% equity stake in the plant, as previously announced. Production is expected to commence in Q2 2026.

Tags: , ,

Category: Fuels

Thank you for visting the Digest.