In the UK, German manufacturer WELTEC BIOPOWER has been commissioned by the English recycling company Eco Sustainable Solutions Ltd. to build a biomethane plant. The plant is located near Bournemouth Airport in the south of England. Eco Sustainable will operate the plant itself and fill the stainless steel tanks with household waste and agricultural residues from nearby businesses and its own farms. A de-packaging plant for food is already in place at another nearby location. From the end of 2025, the plant will produce processed biogas, which will be fed into the national gas grid as a natural gas equivalent.