The PLTBg facility at PT ISJ has a surplus of methane gas that had not been fully utilised. After technical and feasibility studies, Asian Agri allocated the excess gas to a gas‐fuelled generator to produce an additional one megawatt of electricity. That power will be supplied to PT PLN Sumatra Utara under a three-year power purchase agreement.